TSC / CCS / MCS

Test - Integrate - Control

1ACFFC1D.... TM Frame Handling

The CCS and TSC are now able to handle TM frames for test system purposes.
The TM frame handling conforms to ESA-PSS-106. The functionality is configurable to different project needs. Note that RS-codeblocks can be present but are not processed. It is assumed that the link is either error free or the TM frame has already been corrected by other equipment.
Feedback from the TM frames into the TC COP1 flow control is also supported.